Completed in 1998, this project stabilized and rebuilt the river channel section from Houston Street to Commerce where the channel slope drops dramatically from the shallow upstream Hugman section to the broader and deeper concrete River Bend “cutoff” channel. Sidewalks, hardscape, and landscaping in this reach had to be replaced in the historic style of the River Walk.
Acequia Trail Notice
The Acequia Trail will have traffic control on it near the Mission Reach between Graf Rd. and SE Military on Mission Parkway starting next Monday, April 29th. Please use caution around this area.